[edit] Introduction
The National planning policy framework (NPPF) considers flood risk to be the combination of the probability and the potential consequences of flooding from all sources, including:
- Rivers and the sea.
- Rainfall.
- Rising groundwater.
- Overwhelmed sewers and drainage systems.
- Reservoirs, canals and lakes.
- Other artificial sources.
For more information, see National planning policy framework NPPF.
Flood risk management can be loosely defined as the analysis, understanding and appropriate actions based on a flood risk assessment that examines the connection between the sources mentioned in the NPPF as well as physical systems and other environmental conditions.
Actions that address the risks posed by flooding may include:
- Flood defence systems.
- Warning and informing systems.
- Relocation of people in high risk areas.
- Spatial planning.
- Floodplain mapping.
Through these activities, flood risk management can help reduce the risk from flooding for those people located in flood zones.
[edit] The Flood and Water Management Act 2010
The Flood and Water Management Act was introduced on 8 April 2010 to implement Sir Michael Pitt’s recommendations following the widespread flooding of 2007 when more than 55,000 homes and businesses were flooded (see Pitt Review).
The Act required better management of flood risk, created safeguards against rises in surface water drainage charges and protected water supplies for consumers. It also gave a new responsibility to the Environment Agency for developing a National Flood and Coastal Risk Management Strategy.
For more information, see Flood and Water Management Act.
[edit] Flood and coastal erosion risk management FCERM
In 2020, the Environment Agency acknowledged the connection between floods and coastal erosion. Its National Flood and Coastal Erosion Risk Management (FCERM) strategy for England defined FCERM as managing the risks of flooding and coastal erosion to people, property and the natural environment through minimising, predicting and managing the risk.
The strategy sought to identify better methods of understanding and managing the risks and consequences of flooding from:
- Rivers.
- The sea.
- Groundwater.
- Reservoirs.
- Ordinary watercourses.
- Surface water.
- Sewers.
- Coastal erosion.
It also instructed Risk Management Authorities (RMAs) involved in FCERM to exercise their plans and activities consistently with the strategy.
For more information, see Risk management authority RMA.
[edit] Related articles on Designing Buildings
- Adaptive pathways.
- Coast protection authorities.
- Coastal groups.
- Drainage and sewerage management plans DSMPs.
- Flood and Water Management Act.
- Flood risk management plans.
- Flood Risk Management (Scotland) Act 2009.
- Habitat Compensation Programme HCP.
- Long-term investment scenarios LTIS.
- National planning policy framework NPPF.
- Outline planning application.
- Risk management authority RMA.
- Shoreline management plans SMPs.
[edit] External resources
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February